|
|||||||||||||||||||||
|
|
|
| Performance Diagram of Trapezoid Spindle | |
|
|
|
|
Activation Time with ACME Thread Spindle Activation time depends on load and ambient temperature. At maximum load, activation time (ED/AT) is reduced to 20% (cycle time 15 Min., 3 min run, 12 Min pause |
|
|
|
|
| Performance Diagram of Ball-Screw Spindle | |
|
Ratio lifting power/lifting speed/power consumption |
|
|
Activation Time with Ball-Screw Spindle Activation time depends on load and ambient temperature. At maximum load, activation time (ED/AT) is reduced to 10% (cycle time 15 Min., 1.5 min. run, 13.5 Min. pause) |
|
|
|
|
|
|
|
|
|
| Labeling Machine | Transfer System | X-ray Machine | Height Adjustable Assembly Stations |
|
We have attempted to present the information on this website in a straight-forward manner. We offer this information as accurate at the time of publication. Specifications are subject to change without notice. Rose+Krieger is not responsible for inadvertent errors. |
|
©2008 Phoenix Mecano Inc., 7330 Executive Way, Frederick, MD 21704, 301-696-9400, rkinfo@pm-usa.com |